I'm wiring my 3rd garage and mounting my subpanel. I thought I would take a couple knockouts out of the side of the panel as I'm putting it in and drill holes in the studs on either side so I coule bring some romex in through the sides and maybe keep from such a cluster on the top. Is it all right to drill 3 3/4" holes relatively close together in a stud? It is a 2x4 stud. It's not a load bearing stud. Would I need to put plastic inserts in? One hole will be closer to the garage side of the stud then the middle. I could put a nail plate there. Going up the wall can I nail to the sheathing or should I stay on a stud?
Thanks
Bob
Thanks
Bob