5mall5nail5
Well-known member
Hey guys - so I bought a house and pulled up the race deck flooring I had down. I really only had it down in an area of a 3 car garage to give me something better to sit and walk on vs bare concrete. I never got into making it fit exactly or filling the whole floor.
Now, in my new 2-car garage, I want to actually install it wall to wall. However, there's a pole in the center of the garage. So, how does one account for that usually? Just leave a tile out? I might cut a circle in two tiles and install them first and then go outward?
Any thoughts? I've never tried to go wall to wall before. Do you start at the wall and go in or go from the center out?
Thanks guys!
Now, in my new 2-car garage, I want to actually install it wall to wall. However, there's a pole in the center of the garage. So, how does one account for that usually? Just leave a tile out? I might cut a circle in two tiles and install them first and then go outward?
Any thoughts? I've never tried to go wall to wall before. Do you start at the wall and go in or go from the center out?
Thanks guys!