Put multiple attachment points on the wooden forms, then attach a lifting sling to the slab and forms and LIFT it with an engine hoist.
Prep new spot (remove topsoil, go down to needed depth, etc), put in the standard gravel bed, put in a layer of mortar and lay the slab in the mortar bed that is on the new gravel.
Or dig down on the 'ends' of the slab, put down some ground plates to spread the lifting load, use something like a porta-power hydraulic mini-ram jack up the slab enough to get a steel pipe roller underneath from end-to-end, roll the slab away from the building to the desired location, and place the slab on top of the prepped ground (dug down, new gravel bed, probably the same idea of a mortar bed on top of the gravel to set the slab onto).
Or lever it up and walk or otherwise move it over to the desired location.
Or break it up and repour a new pad in the desired location.