Pretty happy with it.
Still have electrical to do.
The pad took about 75 tons of dusty buckshot
And 50 tons of gravel to get everything level and
Prepped for concrete slab. Slab is 4 inches with a couple
Thicker areas for a future lift. Relief cut as well
Still have electrical to do.
The pad took about 75 tons of dusty buckshot
And 50 tons of gravel to get everything level and
Prepped for concrete slab. Slab is 4 inches with a couple
Thicker areas for a future lift. Relief cut as well