Finished my Exelia floor a couple weeks back and sealed it this weekend.
The install was super easy and took about 1.5 hours per half, which included time to run to my basement and make necessary cuts on the edge pieces on my table saw. The locking features on the tiles goes together nicely using a dead blow hammer. I still need to install edging on the entryway on the left side and figure out some sort of baseboard around the perimeter. The only change I would do if doing it over would be to extend the dark grey section one more row towards the door on each side. So far these seem super durable.
The install was super easy and took about 1.5 hours per half, which included time to run to my basement and make necessary cuts on the edge pieces on my table saw. The locking features on the tiles goes together nicely using a dead blow hammer. I still need to install edging on the entryway on the left side and figure out some sort of baseboard around the perimeter. The only change I would do if doing it over would be to extend the dark grey section one more row towards the door on each side. So far these seem super durable.
Attachments
Last edited:
