To avoid these ads, REGISTER NOW!

My Completed Exelia Floor

Marlin

Well-known member
Joined
Dec 6, 2007
Messages
1,037
Finished my Exelia floor a couple weeks back and sealed it this weekend.
The install was super easy and took about 1.5 hours per half, which included time to run to my basement and make necessary cuts on the edge pieces on my table saw. The locking features on the tiles goes together nicely using a dead blow hammer. I still need to install edging on the entryway on the left side and figure out some sort of baseboard around the perimeter. The only change I would do if doing it over would be to extend the dark grey section one more row towards the door on each side. So far these seem super durable.
 

Attachments

  • IMAG2617.jpg
    IMAG2617.jpg
    130.5 KB · Views: 228
  • IMAG2618.jpg
    IMAG2618.jpg
    135.1 KB · Views: 194
  • IMAG2616.jpg
    IMAG2616.jpg
    152.9 KB · Views: 160
Last edited:
To avoid these ads, REGISTER NOW!
To avoid these ads, REGISTER NOW!
To avoid these ads, REGISTER NOW!
Top Bottom