Appreciate any feedback on my first copper pipe job.
I am putting a hose reel on my lean-to. Connecting the reel to the pipe with 3/8 barbed fittings. I wanted to but a shut off on the reel because its a leaker. 3/8 hose with 3/8 ends and 3/8 I/M fittings. Last pic is the drain.
I am putting a hose reel on my lean-to. Connecting the reel to the pipe with 3/8 barbed fittings. I wanted to but a shut off on the reel because its a leaker. 3/8 hose with 3/8 ends and 3/8 I/M fittings. Last pic is the drain.

