Aussie Chris
Active member
Hi all,
I'm fairly new here but thought I may as well jump in with the reason I stopped by here in the first place - renovating my garage.
I'm about to move in to a new house that has a 6m x 12m (20' x 40') garage.
As you can see. it's just a tin shed with a slab, but I'm going to stud it out, plasterboard it, put workbenches, air lines, a bar, a toilet and eventually racedeck.
It'll house Sunday car in one quarter, and the other 3/4 will be workshop. It'll have a large 3.6m x 2.4 island workbench in the middle, and a saw bench down the side.
So, even though I'm not moving in until next Friday, the current owner has been awesome and has already let me go around and start gutting it.
Here's a couple of pics of how it stands at the moment.
Left side stripped. All the stuff you see leaning is going with the new owner.
Right hand side. All this stuff is going with the current owner.
I'm yet to strip all the benches in the back and the right hand sides.
So, I move in next Friday, and start stripping again on Saturday. I have 2 weeks off work and am concentrating 100% on getting this build done in that time, or as much as I can anyway...
Stay tuned for progress.
Cheers,
Chris
P.S Great to be here with like minded fruitcakes!
I'm fairly new here but thought I may as well jump in with the reason I stopped by here in the first place - renovating my garage.
I'm about to move in to a new house that has a 6m x 12m (20' x 40') garage.
As you can see. it's just a tin shed with a slab, but I'm going to stud it out, plasterboard it, put workbenches, air lines, a bar, a toilet and eventually racedeck.
It'll house Sunday car in one quarter, and the other 3/4 will be workshop. It'll have a large 3.6m x 2.4 island workbench in the middle, and a saw bench down the side.
So, even though I'm not moving in until next Friday, the current owner has been awesome and has already let me go around and start gutting it.
Here's a couple of pics of how it stands at the moment.
Left side stripped. All the stuff you see leaning is going with the new owner.
Right hand side. All this stuff is going with the current owner.
I'm yet to strip all the benches in the back and the right hand sides.
So, I move in next Friday, and start stripping again on Saturday. I have 2 weeks off work and am concentrating 100% on getting this build done in that time, or as much as I can anyway...
Stay tuned for progress.
Cheers,
Chris
P.S Great to be here with like minded fruitcakes!





