larryscustomcycles
Member
So I bought a Factory.
We bought a nice house a year ago, it has a 7x7m garage with a mezzanine. Its in a nice leafy Melbourne inner east Suburb.
Here's one of the current projects in the home garage
My habits/hobbies outgrew it, so the only logical thing to do was buy a factory.
So, I found this:
Thats an after pic, before it was full of cool rooms and other dodgy junk. 100 cubic metres of rubbish came out.
Floorspace is 10x10.5m...which you would think was ok, but now look:
Yep, its a mezzanine, 6x10m.
Beyond this and splashing some paint around Im not entirely sure how this will all work out.
It has to have a hoist for my project tarmac rally car, a 1971 Ford Capri Perana.
I have...errr 8 motorbikes and about 15 push bikes. Only 2 motos are running, the new 1200GS and the XS650:
Obviously a bunch of tools and equipment going in there too.
Planning on a dirty area (machining, grinding, welding) an assembly area plus upstairs a clean room for engine building and a paint booth for making paint runs.
Its all coming together now.
Suggestions for a finish on the concrete floor that is badly pock marked from tile removal in some areas?
We bought a nice house a year ago, it has a 7x7m garage with a mezzanine. Its in a nice leafy Melbourne inner east Suburb.
Here's one of the current projects in the home garage
My habits/hobbies outgrew it, so the only logical thing to do was buy a factory.
So, I found this:
Thats an after pic, before it was full of cool rooms and other dodgy junk. 100 cubic metres of rubbish came out.
Floorspace is 10x10.5m...which you would think was ok, but now look:
Yep, its a mezzanine, 6x10m.
Beyond this and splashing some paint around Im not entirely sure how this will all work out.
It has to have a hoist for my project tarmac rally car, a 1971 Ford Capri Perana.
I have...errr 8 motorbikes and about 15 push bikes. Only 2 motos are running, the new 1200GS and the XS650:
Obviously a bunch of tools and equipment going in there too.
Planning on a dirty area (machining, grinding, welding) an assembly area plus upstairs a clean room for engine building and a paint booth for making paint runs.
Its all coming together now.
Suggestions for a finish on the concrete floor that is badly pock marked from tile removal in some areas?