Kinyocase
Active member
This will be my ever slowing project thread for my 30x40 pole barn garage. This will take a good amount of time to get taken care of as money is certainly a gargantuan issue.
After many cold years of working on car outside I've decided it's time to bite the bullet and build this thing as I can spare the money. I've been pricing all my framing materials out and have a price list of 2900 this is with 20 6x6 Treated. I am going to knock this down to 14 footers and go with a 10 foot ceiling. I'm hoping to run a 20 foot Attic Truss section along with a 20 foot Scissor truss section. Still looking into code for an idea on what is necessary for my area.
Well up to today I got out and started plotting the ground for some layout ideas. Spoke with the land owners and they are happy with the placement. I broke ground today...and a shovel. ( Little side note. My boss is an excavation company and his son-in-law is an excavation company, but I'm stuck digging this giant beast by hand. ) I'm got to grade it out quite a bit for the location I've chosen. One side of the building is a good 2.5 feet higher than the other side. On with some pictures. Not many as 3 hours hand digging in clay really kills a guy.
Poor shovel broke on me at .5 hours. Guess I overworked it pulling up some clay.
This is at the one hour mark. Shows a little bit of the scale but not real well. At this point I'd already had a 1/2 gallon of water put into me as it was in the upper 70's. I know that's not all that hot, but this is some tough stuff.
This is me at the 3 hour mark. Was about 5PM and I had to quit for the day as my wife was leaving and my daughter wanted me.
Well I hope you guys enjoyed the quick intro to my ever lasting project. Updates will be incredibly slow, and progress will often seem halted, but I assure you my posts will show up...eventually.
After many cold years of working on car outside I've decided it's time to bite the bullet and build this thing as I can spare the money. I've been pricing all my framing materials out and have a price list of 2900 this is with 20 6x6 Treated. I am going to knock this down to 14 footers and go with a 10 foot ceiling. I'm hoping to run a 20 foot Attic Truss section along with a 20 foot Scissor truss section. Still looking into code for an idea on what is necessary for my area.
Well up to today I got out and started plotting the ground for some layout ideas. Spoke with the land owners and they are happy with the placement. I broke ground today...and a shovel. ( Little side note. My boss is an excavation company and his son-in-law is an excavation company, but I'm stuck digging this giant beast by hand. ) I'm got to grade it out quite a bit for the location I've chosen. One side of the building is a good 2.5 feet higher than the other side. On with some pictures. Not many as 3 hours hand digging in clay really kills a guy.
Poor shovel broke on me at .5 hours. Guess I overworked it pulling up some clay.
This is at the one hour mark. Shows a little bit of the scale but not real well. At this point I'd already had a 1/2 gallon of water put into me as it was in the upper 70's. I know that's not all that hot, but this is some tough stuff.
This is me at the 3 hour mark. Was about 5PM and I had to quit for the day as my wife was leaving and my daughter wanted me.
Well I hope you guys enjoyed the quick intro to my ever lasting project. Updates will be incredibly slow, and progress will often seem halted, but I assure you my posts will show up...eventually.