NCRoadRunner
Member
Recently moved to the Southwestern NC Mountains from coastal SC, big change in scenery... BTW what is that white stuff all over the ground, in SC that was sand...... Damn its cold outside.....
We love it here, a welcomed change. The house is great, but no garage, so a few months back, with a couple of friends, that issue was addressed. It is 32 x 30, with a second floor storage area of 12 x 30. The only parts we did not do was the concrete work, and putting the shingles on the roof. There is still a 'bit' of work outside to do. We will be starting the retaining wall in the front on Monday (presuming the weather stays favorable). At some future point where the barrier is on the porch, that will be a ramp that will connect to the front porch of the house.
As for the inside, currently it's a bit of a mess. Attached are two shots that show the workshop area (about 13 x 32). As you can see there is a lot of effort to go there. All the 6" S&D PVC pipe and fittings arrive on Thursday, so some progress may be made with the Dust Collector to get the duct off the floor.
Annie
already has developed the 'project list' for porch furniture, and a host of other projects.
More photo's to come as we move forward.
Looking forward to 'meeting' and taking part with you.....
Henri
We love it here, a welcomed change. The house is great, but no garage, so a few months back, with a couple of friends, that issue was addressed. It is 32 x 30, with a second floor storage area of 12 x 30. The only parts we did not do was the concrete work, and putting the shingles on the roof. There is still a 'bit' of work outside to do. We will be starting the retaining wall in the front on Monday (presuming the weather stays favorable). At some future point where the barrier is on the porch, that will be a ramp that will connect to the front porch of the house.
As for the inside, currently it's a bit of a mess. Attached are two shots that show the workshop area (about 13 x 32). As you can see there is a lot of effort to go there. All the 6" S&D PVC pipe and fittings arrive on Thursday, so some progress may be made with the Dust Collector to get the duct off the floor.
Annie
already has developed the 'project list' for porch furniture, and a host of other projects. More photo's to come as we move forward.
Looking forward to 'meeting' and taking part with you.....
Henri
Attachments
Last edited:

