The riser pipe running from my subpanel up the face of the concrete block wall is full. I thought there was going to be room to run the three more cables that I need, but the top appears to be constricted.
If I could, I'd punch a hole in the back of the box and run it up inside the concrete block, but the box is mounted on a poured cell, so it is full of concrete.
The exisiting pipe is partially encased in stucco, so removing it and replacing it will be difficult.
Can I just add another pipe onto the box for the wire that I need?
Oh, and I guess this would be a good thing to specify to an electrician when they install it. Another good thing to specify is that you want all of your switches and receptacles wire wrapped instead of back-stabbed, even if it is allowed by code.
If I could, I'd punch a hole in the back of the box and run it up inside the concrete block, but the box is mounted on a poured cell, so it is full of concrete.
The exisiting pipe is partially encased in stucco, so removing it and replacing it will be difficult.
Can I just add another pipe onto the box for the wire that I need?
Oh, and I guess this would be a good thing to specify to an electrician when they install it. Another good thing to specify is that you want all of your switches and receptacles wire wrapped instead of back-stabbed, even if it is allowed by code.