Here's a pic of the first movie night. We mocked up some risers to see how tall we needed/wanted to go and set up a projector to set screen size so we would know where to place the hook ups for the final.
Here's a pic of the south wall showing the shop exterior wall. Finally all of the exterior framing is done. The two outside garage doors went in this week and once insulation is done next week the middle three should go in. The middle doors are on vertical tracks so I won't have any overhead obstructions. The doors will block the windows when up but then I'll get light in through the doors. With the doors down, I get a lot of natural light from the windows.
Here's a couple of inside pics of the main bay. The little room in the middle houses the pressure tank and water heater on one side and a half bath on the other. The upper will get framed in for the furnaces and storage. The lifts will sit on either side of the build out, about in line with the wall so that they are out of bounds for the basketball court. The goal is in its final spot and will some day get replaced with glass. For now it is going to get a nice piece of birch plywood painted white. Final plans are for VCT with the court markings in it. Sealed concrete for the short time, if it won't affect the glue down of the tile.
This is a two car parking stall. Still have to cut out the windows fully but its pretty well done except for trim. Its just wide enough to park my TA and Charger in with a little storage in front of the cars.
Here's a pic of one of the bedrooms showing two walls with the blown in fiberglass. Every exterior wall got 9 inches of dense pack blow in. I'm real pleased with this insulation. They finished the living space today but ran out of material to finish the shop areas. Should finish next week when materials arrives. Drywall starts on Monday!!!