My shop is still going up but making progress. Hope to get the end walls up as soon as I'm done with the cement projects around the shop. I already put in 100 plus feet of "French drains" with two 4 inch pipes, got some of the surface cement drains done. Have some leaks due to bolts we didn't get seated properly and those we missed. Hope to get that done soon too.
Most of the winter months I'll be putting in conduit and electrical.
I painted the cement with epoxy but regret using epoxy already. It's slicker than snot, among other problems. May go to the plastic tile from Rubber Floors inc, has it for a good price. But won't do that till I'm done with everything else. I learned not to get the cart before the horse.
When summer gets here will be spraying on DIY closed cell foam spray from TigerFoam.
http://s1134.photobucket.com/albums/m614/CaptainRay1964
Most of the winter months I'll be putting in conduit and electrical.
I painted the cement with epoxy but regret using epoxy already. It's slicker than snot, among other problems. May go to the plastic tile from Rubber Floors inc, has it for a good price. But won't do that till I'm done with everything else. I learned not to get the cart before the horse.
When summer gets here will be spraying on DIY closed cell foam spray from TigerFoam.
http://s1134.photobucket.com/albums/m614/CaptainRay1964