slimshady_2469
Well-known member
- Joined
- Mar 8, 2009
- Messages
- 112
this was my little weekend project. i gathered a few friends and family over to my moms house to build a 12x24x4 halfpipe for my little brother. so far weve gotten 8x28ish ft with the decks and 4 high built. started saturday around 11 and finished up today around 5pm. right around 450 total cost so far. it has this 1 1/2 i.d. galvanized pipe on the edges of the transitions with have a 7 ft. radius. which i think should be ok for an 11 yr old
oh and there were no plans, this was all just kinda thrown together off the top of my/our heads.
as for the other 4 ft. wide... its gunna have to wait a month or so because im moving and busy as hell with work. hell i had to take this weekend off 4 weeks ago! so for now he can figure it out and get used to it and in a month he can shred! lol
let me know what you think!


as for the other 4 ft. wide... its gunna have to wait a month or so because im moving and busy as hell with work. hell i had to take this weekend off 4 weeks ago! so for now he can figure it out and get used to it and in a month he can shred! lol
let me know what you think!



