My slab is curing as we speak,the 13th of this month will be 30 days since poured.
I'm having a metal building delivered and erected and I would prefer to seal my slab before the building comes.
Please give me some advice guys on the following if possible...all replies would be greatly appreciated
A) Best product to use available locally at most major home improvement centers
B) Best procedure for long-lasting finish.Power wash first,is acid-etch needed on fresh slab?
C) Timeline for prepping,sealing,and drying time before driving cars on it.
Any other tips or tricks you guys can provide would be very welcomed...
I'm having a metal building delivered and erected and I would prefer to seal my slab before the building comes.
Please give me some advice guys on the following if possible...all replies would be greatly appreciated
A) Best product to use available locally at most major home improvement centers
B) Best procedure for long-lasting finish.Power wash first,is acid-etch needed on fresh slab?
C) Timeline for prepping,sealing,and drying time before driving cars on it.
Any other tips or tricks you guys can provide would be very welcomed...