Menards ordered the wrong ideal door rail system for my garage door project.
I needed 4-12 roof rail and they sent me standard.
I custom built a beem construction spec garage to accomodate a car lift and I now have 2 door openers hanging at about 8 feet on 9 foot walls.! The openers are too low because menards didnt order the rails per the print.
I provided a blueprint for roof rail 9 ft wall 8 ft doors (2)
They shipped the standard track not the 4-12 shown in the drawing.
They ordered the wrong parts.
I was away when the installer put the wrong parts up. Altho I told him what I was doing and he sent a kid in to hang the doors and didnt advise the kid.
The kid hung what was there and did not know to stop because the the boss didnt tell him it was roof mount rail.
1-How do I verify the new replacement conversion kit will work?
2- Menards claims I am responsible to pay for the new conversion parts kit.
3- I showed them on the drawing what I needed before they placed the special order, with the manager. They messed up and ordered the wrong parts.
4- The manager says its up to me to know the correct part before I sign. I have no way of knowing as the original order did not show the actual description of the 4-12 roof rail vs the standard mount.
Now IM on the hook for 2x new railsystem, not sure the conversion kit will interface with the rest of the system and have to repay for both rehang and new conversion kit. ? At this point Im going to be out 800.
I'm getting the shaft.
Any help?
I needed 4-12 roof rail and they sent me standard.
I custom built a beem construction spec garage to accomodate a car lift and I now have 2 door openers hanging at about 8 feet on 9 foot walls.! The openers are too low because menards didnt order the rails per the print.
I provided a blueprint for roof rail 9 ft wall 8 ft doors (2)
They shipped the standard track not the 4-12 shown in the drawing.
They ordered the wrong parts.
I was away when the installer put the wrong parts up. Altho I told him what I was doing and he sent a kid in to hang the doors and didnt advise the kid.
The kid hung what was there and did not know to stop because the the boss didnt tell him it was roof mount rail.
1-How do I verify the new replacement conversion kit will work?
2- Menards claims I am responsible to pay for the new conversion parts kit.
3- I showed them on the drawing what I needed before they placed the special order, with the manager. They messed up and ordered the wrong parts.
4- The manager says its up to me to know the correct part before I sign. I have no way of knowing as the original order did not show the actual description of the 4-12 roof rail vs the standard mount.
Now IM on the hook for 2x new railsystem, not sure the conversion kit will interface with the rest of the system and have to repay for both rehang and new conversion kit. ? At this point Im going to be out 800.
I'm getting the shaft.
Any help?