Hey guys, hopefully someone here is a plumber that can double-check my plan. I'm building a 50x80 workshop with living quarters. First floor has 2 full baths, utility sink, washing machine, and another drain for future use if i need it. I'm building in stages, but plan is eventually the Upstairs will have master bathroom, half bath, and kitchen.
Trying to get the under slab plumbing in this week so we can pour concrete next week. Please check out my video and let me know if it all looks ok.
.
Trying to get the under slab plumbing in this week so we can pour concrete next week. Please check out my video and let me know if it all looks ok.
.
Attachments
Last edited:
