Hi all
I need some ideas. Here's the problem. I had my new shop floor poured in November and the concrete guys screwed up the level. It is mostly level until you get close to the big door then it is high by about 1.75". They said they would fix it in the Spring and so I built the shop as best as I could around the problem. Now they are here to fix it and I'm not sure what the best solution is. My ideas are 1) Grind the high spot down and then level with an epoxy coat. 2) Remove the concrete and repour (doubt they would go for that) 3) Pour new concrete over the old concrete (I would lose some height to my garage door though).
Update: I just talked to the concrete guy and he says that they will pour min 3" concrete over the old floor (with rebar), pay to raise the door and redo the apron. Does this seem like a good idea? Anything I should watch out for? I have been waiting so long to move my stuff into the shop but I just want it done right. I will have to wait awhile before I can epoxy coat it too.
I need some ideas. Here's the problem. I had my new shop floor poured in November and the concrete guys screwed up the level. It is mostly level until you get close to the big door then it is high by about 1.75". They said they would fix it in the Spring and so I built the shop as best as I could around the problem. Now they are here to fix it and I'm not sure what the best solution is. My ideas are 1) Grind the high spot down and then level with an epoxy coat. 2) Remove the concrete and repour (doubt they would go for that) 3) Pour new concrete over the old concrete (I would lose some height to my garage door though).
Update: I just talked to the concrete guy and he says that they will pour min 3" concrete over the old floor (with rebar), pay to raise the door and redo the apron. Does this seem like a good idea? Anything I should watch out for? I have been waiting so long to move my stuff into the shop but I just want it done right. I will have to wait awhile before I can epoxy coat it too.