RetiredLiving
New member
- Joined
- May 7, 2023
- Messages
- 1
I am having an epoxy flooring (Sherwin-Williams) installed on my 5 yr old garage floor in SW Florida (should be warm weather to aid in curing time). The job is schedule and ready to go, but now I find I have to leave for several weeks soon after, and will need to park my vehicle in the garage after only 4 days of curing. I'm thinking that I can purchase four tiles, one for each tire, like "TrueLock HDXT" tiles (maybe even the ribbed flow-through tiles to allow for better curing). My big issue, as stated, is only having 4 days of curing instead of a week. My Question for you all is, "will the weight of the car on the 4 tire tiles cause any permanent damage or deformity to the new epoxy floor?"
