When installing a service disconnect meter base, then using a 4 wire setup to connect to the main panel, is the main panel then treated as a sub panel with the neutral bus bonding jumper removed?
The neutral and ground wire are tied to the same bus in the meter base. Thanks, Russ
The neutral and ground wire are tied to the same bus in the meter base. Thanks, Russ