bagged89s10
Well-known member
I’m getting ready to build a 24x24 or 24x32 garage. I’m in Connecticut so have to deal with snow loads and frost lines.
I’m trying to build it on as low of a budget as possible so i’ll be trying to do a lot of the work myself.
My options are a pole barn garage or a stick built.
I’ll be building this garage at the same time i’m having an addition put on my house so i’ll be hiring an excavation contractor and a mason or concrete contractor to dig for the footings
My wife wants the garage to match the house with vinyl siding and asphalt roof so either style will need the same about of sheathing. Do I use 1/2” everywhere? or 7/16” for the walls. or 5/8” for the roof? I’m leaning towards plywood vs osb.
Ive been thinking a pole barn style would be the cheapest with a lot less concrete and less trusses. Less trusses and purlins.
the slab is going to cost the same. 3500psi is about $129 per yard right now.
what has me confused is what I have to do at the bottom of the pole barn to seal it properly. Is it usually ok to just pour the slab up against the bottom pressure treated girter? I’ve seen people make a “U” at the bottom as a rat guard and pour the slab to the interior of that “U”. I’ve seen others pour the slab under that board and use foam board insulation under the exterior girter. then i’ve seen others just have a girter on the exterior of the posts and pour concrete to that. What’s the best way and what’s actual code? or where in the code section can I find this?
Or is it code to pour a concrete rat wall? I also have to consider the cost of a concrete truck to come out is $350 for less than 4 yds I believe.
i’m going to have everything drawn up by our architect and taken to the town for approval
and permits but would like to get as much info before sitting down with my architect.
I’m trying to build it on as low of a budget as possible so i’ll be trying to do a lot of the work myself.
My options are a pole barn garage or a stick built.
I’ll be building this garage at the same time i’m having an addition put on my house so i’ll be hiring an excavation contractor and a mason or concrete contractor to dig for the footings
My wife wants the garage to match the house with vinyl siding and asphalt roof so either style will need the same about of sheathing. Do I use 1/2” everywhere? or 7/16” for the walls. or 5/8” for the roof? I’m leaning towards plywood vs osb.
Ive been thinking a pole barn style would be the cheapest with a lot less concrete and less trusses. Less trusses and purlins.
the slab is going to cost the same. 3500psi is about $129 per yard right now.
what has me confused is what I have to do at the bottom of the pole barn to seal it properly. Is it usually ok to just pour the slab up against the bottom pressure treated girter? I’ve seen people make a “U” at the bottom as a rat guard and pour the slab to the interior of that “U”. I’ve seen others pour the slab under that board and use foam board insulation under the exterior girter. then i’ve seen others just have a girter on the exterior of the posts and pour concrete to that. What’s the best way and what’s actual code? or where in the code section can I find this?
Or is it code to pour a concrete rat wall? I also have to consider the cost of a concrete truck to come out is $350 for less than 4 yds I believe.
i’m going to have everything drawn up by our architect and taken to the town for approval
and permits but would like to get as much info before sitting down with my architect.