As a long time lurker I learned a lot from this site while I was planning my new garage. We broke ground about a week and a half ago and finally got the footings/foundation poured this past week. They should be back filling and framing this week.

Footings dug out.

Footings dug out.

The mess.

In order for me to maximize my ceiling height, they had to excavate my existing driveway/yard down. Now I am stuck with this hill. An unexpected landscaping expense I am not looking forward to. Any suggestions?

Footing forms installed.

Foundation poured.

Foundation poured.

Footings dug out.

Footings dug out.

The mess.

In order for me to maximize my ceiling height, they had to excavate my existing driveway/yard down. Now I am stuck with this hill. An unexpected landscaping expense I am not looking forward to. Any suggestions?

Footing forms installed.

Foundation poured.

Foundation poured.