Hi, I am finally getting a good start on the prep of my new shop. I had a freind clear the land and I bought a tractor to finish the prep work. I removed a pine stump yesterday and was wondering if anybody had any advice as to refilling the hole. I had a freind say I needed to fill it back up with gravel, but I was just planning on fill it back in with the clay type dirt I removed. There will still be a ton of work in that area with the tractor, so I was thinking it should get packed down pretty good with the constant running over it with the tractor. Anyway, here's a few pics of the progress: