Crazy, good, or what’s a better way to spend the money?? Seems crazy, but it’s also been pretty consistent.
Getting quotes at 40-50k for a 30x40X14, insulated, 12’ overhang on one short end, 12’ lean to down one long side. Including concrete, 26ga, and concrete under the overhang, but not the lean to.
Getting quotes at 40-50k for a 30x40X14, insulated, 12’ overhang on one short end, 12’ lean to down one long side. Including concrete, 26ga, and concrete under the overhang, but not the lean to.
