Concrete being poured tomorrow so hopefully start next Thursday building? A couple of concerns I'm having is protecting the base of structure from moisture and bugs. Thinking of going around the base with a roll of tar paper then Tyvec over that? Then down the road I want a eight foot door on interior of the shop for my heated work area and looking at the clear vinly slates that you would see in a meat locker/ cooler area, any thoughts out there? Thanks
