I finally put in the ceiling in my 30x36x12 shop. I used 1/2" osb, smooth side out, and did it myself with my wife working the drywall jack. I have zero carpenter experience and the job was tough. My arms are sore from using the big nail gun and my neck is sore from constantly looking up, but 2 days and it's finished.
After I finished, I've had people tell me I should have staggered the **** joints on the sheets. Seems like it's too late now. Is this a huge problem?
When I get ready to finish the walls, should I stagger the joints there?