New cement in shop

Darcy86

Member
Joined
Apr 30, 2013
Messages
15
My cement was poured 3 days ago, I am drinking beer and barbecuing in it right now, my buddy wants to put his maverick in here while he is at work, we might put it in here tomorrow or the next day. How long should I wait until I put the Maverick or any kind of real weight in here? I know it weighs about 1300lbs:beer:
 

Attachments

  • 20140318_142653.jpg
    20140318_142653.jpg
    141.3 KB · Views: 103
To avoid these ads, REGISTER NOW!

kd3pc

Well-known member
Joined
Aug 10, 2013
Messages
3,630
Location
Northern Neck
7-10 days would be about the quickest I would drive in....but that is me.

I would cut some control joints as well, did not see any in the pic..
 
OP
D

Darcy86

Member
Joined
Apr 30, 2013
Messages
15
Is this something that should be done right after or can i still get it done
 
To avoid these ads, REGISTER NOW!

rburke65

Well-known member
Joined
Nov 10, 2007
Messages
12,349
Location
Canfield, Ohio
You can do it now.....doing it after the placement of the concrete, as soon as you could walk on it without leaving marks, would have been optimum......I think. And I would wait at least a week. Were did you buddy park the car before you had a floor?
 