Help, I had a 30x48 slab, 5in thick poured approx. 3 months ago. Then approx 2 months ago I cut control joints every 10 ft by 12 ft, 1 inch deep. Previous to the cutting their were no cracks of any kind. Just the other day I went to check on it and noticed that on one end of the building(the end where I used 16 in of fill, but I did compact very good) along the cut line had opened up from a 1/4 wide cut to almost 1/2 wide!! The crack was also visible down inside the cut and was almost a 1/4 also. What do I do? Has it settled there and will probably stay close to that or should I expect it to widen. Right now, I'm not worried about it as I plan to fill anyways for epoxy but I dont want it to grow much more. I also have developed some small hairline cracks that sem to run up to about 8-10 ft long and then just stop. Should I grind them and patch before epoxy or not?