I poured on Friday, kept wet until Sunday. Here, they don't water foundations - they just put 'em down and go. You get small cracks here whether you like it or not. When I poured mine the slab stayed over 100F, 130F when it dried out.
As for wait, the house next door has 92 yards in the foundation. Pour started at 6:30AM. The boards were off by 4 PM. I think the framers showed up about 5 days later. Your slab takes usually 30 days to fully cure. I poured on 7/24 and put lumber on it on 8/8. Would have been sooner but had to wait on material bids to come back.