You'll need to wait 28 days.
There are epoxy primers that can be applied right after the pour, but they're a bit specialized. We sell it, but the window for your project has long since passed, it needs to be applied within 12 hours.
At this point you need to wait for the 28 day mark to pass.
Also, for the best performance you should still etch the floor before coating.