Hi guys, I just received 2 quotes for a new driveway and wanted your feedback. Both prices are nearly identical ($8k for 2000 sqft) and the quotes for the most part look similar. Please let me know if anything looks off, or if I should follow up with specific questions for them. Thanks!
QUOTE #1
1. Excavate and remove old driveway
2. Install gravel as necessary min. 4-6".
3. Fine grade and compact for proper water pitch.
4. Pave 2.5 inches (2" compacted) binder course, applied, spread and compacted.
5. Pave 2 inches (1.5" compacted) finish course, applied, spread and compacted.
6. All exposed edges to be compacted to a 45º angle for better support.
7. Seal end of driveway with liquid tac.
QUOTE #2
1. Excavate and remove old driveway
2. Lay Tbase binder to reinstate foundation up to 12”, compacting in 3 to 4” stages (compacting in stages ensure proper compaction rate) using a vibratory machine roller.
3. Fine grade base with machine to correct pitch & levels.
4. Repave with 3.5” high-grade Driveway top, and machine roll to a smooth and compact finish.
5. All exposed edges to be compacted to a 45° angle for extra support & aesthetics.
6. Seal end of driveway with liquid tac coat emulsion black sand.
( all depths and thickness are before compaction )
QUOTE #1
1. Excavate and remove old driveway
2. Install gravel as necessary min. 4-6".
3. Fine grade and compact for proper water pitch.
4. Pave 2.5 inches (2" compacted) binder course, applied, spread and compacted.
5. Pave 2 inches (1.5" compacted) finish course, applied, spread and compacted.
6. All exposed edges to be compacted to a 45º angle for better support.
7. Seal end of driveway with liquid tac.
QUOTE #2
1. Excavate and remove old driveway
2. Lay Tbase binder to reinstate foundation up to 12”, compacting in 3 to 4” stages (compacting in stages ensure proper compaction rate) using a vibratory machine roller.
3. Fine grade base with machine to correct pitch & levels.
4. Repave with 3.5” high-grade Driveway top, and machine roll to a smooth and compact finish.
5. All exposed edges to be compacted to a 45° angle for extra support & aesthetics.
6. Seal end of driveway with liquid tac coat emulsion black sand.
( all depths and thickness are before compaction )