rotortuner
Well-known member
Just want to run something by you guys. I have a 60x68 building and am going with a new dedicated service. The meter will be close to on the of corners. To minimize runs to outlets etc. My plan has been to use a 320-400 meter base with twin 200 amp disconnect breakers. Then on two adjacent walls have a 200 amp distribution panel, then a 100 amp sub panel on the other two walls. essentially I woud have a panel either, 100 or 200 amp on each wall. Overkill?
Electrical supply house is trying to talk me out of the meter base disconnect because its so expensive, but I believe I need this since my panels are a ways back into the building an not on the back of the wall where the meter is located. One of the panels is going to be on the back wall about 50ft away. thoughts?
Electrical supply house is trying to talk me out of the meter base disconnect because its so expensive, but I believe I need this since my panels are a ways back into the building an not on the back of the wall where the meter is located. One of the panels is going to be on the back wall about 50ft away. thoughts?