mike348
Member
Finished my floor yesterday. 900 ft. 100% epoxy. wolverine brand. It took 6 gals. of mixed epoxy to complete.
Went OK, I mixed up 1.5 gals at a time. It had 30 min pot life. Used a roller. If I had to do it again I would have another person. One to squeegee it out and one to smooth out with roller. I would also get some of the shoe spikes I once saw to walk out on it to fix flaws . Took 3 hrs to start firming up with Slab at 70 degrees. Tack free at 6 hrs. Picture taken at 36hrs.
