I few months ago I had a steel building built and just reached the point where I want to epoxy the floor but found that the top layer of the concrete is coming off in spots. I had several paint contractors look at it and each said that more of the floor would come up when pressure washed and sure enough when I had one guy come in and pressure wash the floor a lot more came off. The rep from Sherwin-Williams came to look and recommended shot blasting the floor to remove the top layer and resurfacing the entire floor. What happened? I read in other threads about water curing for 5 days or more and concrete blistering. This curring was not done but it wasn't done when I had an extension built on my house 10 years ago and i didn't have this problem.