Moving into a new house (new construction) in a couple of weeks. I'd like to do something to the floor before I move in both for stain resistance, and a nicer workspace.
Here are some details:
-About 650 sq feet new slab.
-Located in Dallas area
-Will be for mixed use. Parking, vehicle maintenance (so fluid resistance), light fab (grinding, TIG welding).
-Looking for a white, or very light finish.
-Non-skid is needed.
Selection criteria:
-Budget is a concern.
-I'll have somewhat limited time between taking possession and moving in, so max 3-4 days to finish (and be ready for foot traffic).
I'm leaning towards a stain/sealer system, but would appreciate any guidance.
Thanks,
matt
Here are some details:
-About 650 sq feet new slab.
-Located in Dallas area
-Will be for mixed use. Parking, vehicle maintenance (so fluid resistance), light fab (grinding, TIG welding).
-Looking for a white, or very light finish.
-Non-skid is needed.
Selection criteria:
-Budget is a concern.
-I'll have somewhat limited time between taking possession and moving in, so max 3-4 days to finish (and be ready for foot traffic).
I'm leaning towards a stain/sealer system, but would appreciate any guidance.