To avoid these ads, REGISTER NOW!

New floor question

J Persons

Well-known member
Joined
Jul 27, 2010
Messages
640
Location
Louisiana
I'm prepping my floor prior to applying the Legacy HD6600. I've got it pretty clean using 409 and a scrub brush, plus a final wash with a power washer today. How long should I wait before rolling on the HD 6600? The concrete has no standing water on it, but does have some dark areas. Should I wait until all the dark areas disappear?
Thanks, John
 
To avoid these ads, REGISTER NOW!

Shea

Well-known member
Joined
Sep 19, 2012
Messages
2,864
Location
California
The HD6600 is an acrylic hybrid I believe. Acrylic doesn't like moisture when being applied, so I would wait at least 24 hours before application to make sure all the moisture is out of the concrete. Maybe a bit longer if the humidity is up since you live in Louisiana. I would give Legacy's tech line a call though just to be sure.
 
To avoid these ads, REGISTER NOW!

thomaskept

Member
Joined
May 14, 2013
Messages
16
Location
Australia
I have try to solve your problem. My personal experience I share with you. You can use acrylic to avoid moisture and keep your floor cleaning, and it can easily add on water and give tuff and use this is in rolling.
 
Last edited:
To avoid these ads, REGISTER NOW!
Top Bottom