Greetings All...I've finally begun the build on my 40 x 40 dream garage that I intend on documenting here, but right now I need some advice from the pros...Here goes: I eventually want to run water and electric off of my main building to the garage, but at this point my builder says I have to rough in the pipe prior to the concrete pour on Monday. I should probably mention that I don't have permits for the water or electric portion of the build yet because I didn't intent to do this until Spring '11 at the earliest. I'm looking for qualified suggestions for how and what I need to do at this point to ensure success when I finish the water and electric later on. Pipe size? How much? Metal or PVC? Where in conjuction to the walls should the pipe go? This is all a first for me, so any help you folks can provide will be greatly appreciated. Thanks, Jim