My original plan with my new 960 sq ft garage was to have the slab poured before the building was framed. However, we are now into December here in sunny Seattle, which means rain. My builder has suggested that we finish the foundation (footers are in, foundation walls about to be poured) and then begin framing, thus enclosing everything before the slab is poured. This will allow the slab to be poured and finished without worry of rain.
Here is where we stand as of this morning, with the forms in place for the wall pour.
Anyone have thoughts on doing things in the sequence described above?
Here is where we stand as of this morning, with the forms in place for the wall pour.
Anyone have thoughts on doing things in the sequence described above?