I did mine after the garage foundation was in place, and the building completed. Trenched from the pole to the building, and installed 3" conduit up the pole with a weather-head, and a slip joint at the other end. I had to supply and install the meter socket, and put a 200 amp disconnect on the backside of the meter socket, so I didn't have to be concerned with hooking up the panel immediately. I used a deep trench, because I had an excavator on sight, and figured that it was better to put it lower, so if it were to ever get water in it, that the water wouldn't freeze. So far, the best that I can tell, the conduit is still dry. The meter is under a long overhang, and the wires all have a drip loop before they enter the weather-head.