e-tek
Well-known member
With the Nanny off sick, my first 2 weeks of holidays have gone by without much getting done. I've been having to play baby-sitter (Mrs E-tek has this nasty way of referring to it as "parenting"!) I did manage to get my new gate done though!
I wanted it to swing open to give an unobstructed drive to my shop, so by drilling a hole in the concrete curb and fabbing up a single-point hinge for the top, I was able to do just that. I also re-re-purposed the wheel that was first on a kids wagon, then became a set of training wheels for my sons bike!
The old gate (YUK!) -
Materials (about $100 worth) -
Of course now the Mrs wants me to re-build a similar fence on the other side....oh well, after a "brutal" 3-day work-week next week, I'm off again for another 2 weeks....
I wanted it to swing open to give an unobstructed drive to my shop, so by drilling a hole in the concrete curb and fabbing up a single-point hinge for the top, I was able to do just that. I also re-re-purposed the wheel that was first on a kids wagon, then became a set of training wheels for my sons bike!
The old gate (YUK!) -
Materials (about $100 worth) -
Of course now the Mrs wants me to re-build a similar fence on the other side....oh well, after a "brutal" 3-day work-week next week, I'm off again for another 2 weeks....

Ha Ha!!! True - but this is "outside" work and the Rotisserie (as much as aI want to get at it!) can wait for inclement weather. But again, if the damn Nanny wasn't away sick, I coulda got it aLL done.....
