Verdorbene
New member
- Joined
- Dec 4, 2009
- Messages
- 2
Good morning, I recently found this web page and needless to say there has been some great designs and fabrication. I am interested in building or should I say having a garage built for work and play. I want a 20x30 to and figured living in a residential area that a stick building would be the way to go. My question is to subcontract the jobs out (excavation, footer, foundation and (7) coarses of block) I am finding a hard time with getting coonsistent quotes. I have been quoted between 8-12k for just the foundation which would consist of: excavation, 7 tiers of block, footer, 5 inches of stone, 6 inch pad of 4000 psi which will be reinforced with rebar and the hangers in the block to mount the stick build. Does this sound right?
There are many facets of the job that I could do but, I am looking to see a breakdown between materials and labor. I was thinking the best route would be get a materials list and then just pay for labor.... probably could offset with working with friends in some aspects. I would like to have (4) windows, entrance door, garage door is going to have to be larger to accomidate a full size truck, work benches, motorcycle and lift, quad and some tools. I was hoping to do this under 15k does this sound reasonable? This would be a rough build.... exterior only, I figure electrical, insulation and finished interior would be something I would do over time.
Happy Holidays and thanks for the input...
Kurt
There are many facets of the job that I could do but, I am looking to see a breakdown between materials and labor. I was thinking the best route would be get a materials list and then just pay for labor.... probably could offset with working with friends in some aspects. I would like to have (4) windows, entrance door, garage door is going to have to be larger to accomidate a full size truck, work benches, motorcycle and lift, quad and some tools. I was hoping to do this under 15k does this sound reasonable? This would be a rough build.... exterior only, I figure electrical, insulation and finished interior would be something I would do over time.
Happy Holidays and thanks for the input...
Kurt