Should I do mechanical at the same time? Electric and plumbing.
Will most likely need to update the current panel on home to provide for a sub panel feed to the shop. Very close to current panel < 30’. New shop footer will be almost touching the current main sewer line, makes sense to tap that and have a roof vent installed during the building process. Water feed would be from a now abandoned 1” unpermited irrigation line that is underground.
Will most likely need to update the current panel on home to provide for a sub panel feed to the shop. Very close to current panel < 30’. New shop footer will be almost touching the current main sewer line, makes sense to tap that and have a roof vent installed during the building process. Water feed would be from a now abandoned 1” unpermited irrigation line that is underground.