Figured I’d post the way I do these in about 15 min a side for install. This track weighs about 500lbs
Get the machine at a height track will just be able to clear the cleats on all the rollers.
Crane or forklift track over rear sprocket.
Force front edge of track over front track frame with a 5-6’ bar to get it close
Then lay in 4 12” 1.75 heavy wall tubing in the cleats on the bottom of the trac just behind front roller
Get in machine and start engine and reverse track slowly till pipes wedge on roller, and the front track cleats clear front roller
Then push, sledgehammer or ram with a forklift, chain come along front of track over till it’s middle of roller
Once overcentered drove more backwards with that track till pipes fall out. Tighten your track adjuster to spec and your done. Easy!
Suggest a helper better than mine. ****** wouldn’t even run machine, help pry or tel me pipe positions





Get the machine at a height track will just be able to clear the cleats on all the rollers.
Crane or forklift track over rear sprocket.
Force front edge of track over front track frame with a 5-6’ bar to get it close
Then lay in 4 12” 1.75 heavy wall tubing in the cleats on the bottom of the trac just behind front roller
Get in machine and start engine and reverse track slowly till pipes wedge on roller, and the front track cleats clear front roller
Then push, sledgehammer or ram with a forklift, chain come along front of track over till it’s middle of roller
Once overcentered drove more backwards with that track till pipes fall out. Tighten your track adjuster to spec and your done. Easy!
Suggest a helper better than mine. ****** wouldn’t even run machine, help pry or tel me pipe positions