Putting in a metal building, 30ft x 80 ft. On the 80 ft side, one end is about 26 inches lower than the other end, as my land slants downward. I'm putting in builder's sand to install it level. Question if have is how I should blend the end I'm having to build up into the existing ground. It's a 26 inch drop, but over what distance?

