Yep, they brought a truckload of metal and wood one day, and had the skeleton of the building up within 2 days and had it all done within 5 days. I added the ceiling, did the wiring myself, and worked with Wolverine Coatings for the floor. I found a good deal on a 2 ton self-contained heat pump and will be installing that near the end of the month.