Good morning folks,
I've built a 40x50 pole barn, steel sided, 6x6 poles and it will be steel inside as well. There is infloor heat piping installed in the concrete floor.
Beginning to run the wiring, there's a 100A panel already installed.
Do I have to drill thru the center of each 6" post for runs of wire, or can it be run along the strapping (2x4's).
Many thanks.