I had planned on 200amp service without even knowing my needs.
I started searching to figure out a material lists of what I need to buy before the concrete is poured. (I want underground service) and came across several people getting by with 100 amp service.
Question is what is the rough cost difference?
Wouldn't it be better to have more now than not enough later etc?
Am I overdoing it with 200 amp?
Welder, plasma cutter (GJ group buy), lights, air compressor, TV, Fridge, Radio, various power tools, small AC for now, heater, etc etc. Typical shop stuff I would think. Not much would be on at the same time I cant imagine
I started searching to figure out a material lists of what I need to buy before the concrete is poured. (I want underground service) and came across several people getting by with 100 amp service.
Question is what is the rough cost difference?
Wouldn't it be better to have more now than not enough later etc?
Am I overdoing it with 200 amp?
Welder, plasma cutter (GJ group buy), lights, air compressor, TV, Fridge, Radio, various power tools, small AC for now, heater, etc etc. Typical shop stuff I would think. Not much would be on at the same time I cant imagine