Well I figured I should update this thread as I finally got all the shingles up. I still have to trim the rake edges and install the ridge vent and ridge shingles. I found out I can't get my first rough in inspection done until I get the electrical done. So once I tidy up the roof I can move inside and start running wiring. I will probably Go ahead and by and install the windows and doors as well. I will have to shim them out by 5/8" as I will be using T1-11 siding and I want the windows to end up flush with the surrounding siding. Then trim as usual.
I still have a long way to go but it is finally starting to feel like I am getting close.
Here is what it looks like now. (actually the roof pic is old as both sides are shingled now.)
Max