Beal095
Well-known member
Hi guys. My shop concrete has cured for 45 days. It was not sealed. It was power troweled. I’ve ordered the ArmorPoxy ArmorClad kits. I am planning to rent a grinder with a diamond bit. Do need to just rough up the surface a bit? Or how much grinding is needed?
