The new shop construction is progressing nicely. I posted first about one month ago, just after pouring the slab. We are building about 2300 square feet in the rear yard. The family gets a new pool, and I get a place to stay.
Front exterior, about two weeks ago. pool forming in the foreground.
A nice view of the pool and rear of the house while looking out of one of the triple windows on the front of the shop. A car will be parked in front of each window set.
Brick was completed today. Closed (faux) shutters will occupy the spaces to the left.
Benches/storage will go on this wall. Upstairs is a very large space for the "parts department"
Two post lift will be located in this area. Benchtop/base cabinets will go on the wall below the windows. I chose the windows because my eyes scream for more light with every passing year. These windows face south.
Front exterior, about two weeks ago. pool forming in the foreground.
A nice view of the pool and rear of the house while looking out of one of the triple windows on the front of the shop. A car will be parked in front of each window set.
Brick was completed today. Closed (faux) shutters will occupy the spaces to the left.
Benches/storage will go on this wall. Upstairs is a very large space for the "parts department"
Two post lift will be located in this area. Benchtop/base cabinets will go on the wall below the windows. I chose the windows because my eyes scream for more light with every passing year. These windows face south.
